I picked up a new (to me) computer.

I just purchased a 2010 Mac Pro to replace my 2008 Mac Pro (which I had upgraded with a pair of 3.2GHz CPU’s), the machine looks the same outside, but on the inside is a lot better suited to doing videos.

I transferred the various cards into the new machine, and the SSD etc.

The new machine transcodes video in half the time of the old machine, so it was worth the effort and expense.

I did a 46 minutes long test video on both machines, the old machine transcoded it in 65 minutes 15 seconds, the new machine did it in 32 minutes 40 seconds!

The new machine has dual 6 core, 2.93GHz CPU’s, with the possibility of upgrading it with 3.46GHz versions.

I’m visiting Australia, and met Dave!

I am currently visiting Australia.

I spent several days roaming around the Gold Coast with my wife, then we flew down to Sydney today and dropped by the EEVBlog lab and spent a few hours chatting with Dave.

Dave was kind enough to run me through his production process and even bought us lunch!

It was great to be able to meet Dave and we had some good conversations.

Whilst we were there Dave recorded a video on a calculator I had gifted him, it will be interesting to see the final edited video when he publishes it.

The ability to drop by the lab and spend so much time chatting was especially appreciated as Dave was still getting over being ill.

We drove over the harbour bridge on the way to our Airbnb, I got some video whilst we drove over, it is smaller than it looks!

I am back in my house, sort of.

I am sort of back in my house, I am in the process of moving everything back in, and trying to set up my lab, which includes re-organising how it is setup.

There are still things that the builders haven't finished, such as the kitchen! they haven't shown up for two weeks so far... to do a days work to finish it.

My flooring is now being done

My house is almost ready to move back into, I installed a new ranch slider the other day (after the builders failed to show up).

I then had to buy and install new skirting and door trims so the painter could finish his work (again the builders failed to show up to do the work they missed, see a theme here?)

Now my flooring is being laid, so if all goes to
plan I will be able to move back in within the week.

My house is finally being fixed

So my house which was flooded on January 5th has finally started to have work done to repair it.

House has been gutted, now I just have to wait whilst it is fixed.